TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 255 of 704

0023-3
Change 1
TB 9-3950-253-13&P
0023
INSTALLATION
00023
WARNING
During these procedures, the operator will be required to climb on and around the vehicle.
Be sure to wear suitable footwear and ensure no surfaces are slippery. Wear suitable
gloves and hard hat. Failure to follow this warning may result in injury to personnel.
NOTE
Install hoses as tagged during removal.
Remove caps from hoses and fittings prior to installation.
1. Install stowage cylinder (Figure 1, Item 5), cylinder bearing (Figure 1, Item 6), and snap ring pin (Figure 1,
Item 2) on stowage assembly (Figure 1, Item 1).
2. Install stowage cylinder (
Figure 1, Item 5), retaining pin (Figure 1, Item 3), and snap ring pin (Figure 1, Item 4)
on stowage assembly (Figure 1, Item 1).
3. Install two hydraulic hoses (
Figure 1
, Item 7) on stowage cylinder (
Figure 1
, Item 5).
END OF TASK


Back to Top