TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 251 of 704

0022-3/(4 Blank)
0022
TB 9-3950-253-13&P
INSTALLATION – CONTINUED
Figure 1.
Stowage Latch and Actuator.
0022
END OF TASK
FOLLOW-ON TASKS
00022
1. Check for air leaks (
WP 0020)
.
2. Verify proper operation of stowage latch (WP 0007).
3. Stow lift frame on vehicle (WP 0007).
END OF TASK
END OF WORK PACKAGE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17


Back to Top