TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 242 of 704

TB 9-3950-253-13&P
Change 1
0021-18
0021
HEMTT STOWAGE ASSEMBLY INSTALLATION – CONTINUED
00021
5. Install control boxes on stowage assembly (WP 0029).
NOTE
Install hoses as noted during removal.
6. Route pneumatic line (Figure 19, Item 5) from under stowage assembly and connect to solenoid valve
(Figure 19, Item 6).
7. Route two hydraulic hoses (Figure 19, Item 3) from under stowage assembly and connect to manifold
(Figure 19, Item 4).
8. Install manifold cover (Figure 19, Item 2) on stowage assembly (Figure 19, Item 7) and tighten three locking
pins (Figure 19, Item 1).
Figure 19.
Connect Hydraulic and Pneumatic Lines.
0021
3
1
2
5
6
7
7
4


Back to Top