TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 469 of 704

0048.1-11
Change 1
TB 9-3950-253-13&P
0048.1
CONVERT TO STANDARD CONFIGURATION – CONTINUED
9. Remove ratchet strap (Figure 11, Item 1) from lift frame (Figure 11, Item 2) and truck frame (Figure 11, Item 3).
10. Attach sling and lifting device to lifting eye at top of lift frame (Figure 11, Item 2).
Figure 11.
Raise Lift Frame.
048
11. Use lifting device to raise lift frame (Figure 12, Item 1) until roller pins (Figure 12, Item 2) align with stowage
guide (Figure 12, Item 3).
Figure 12.
Align Roller Pins With Stowage Guide.
048
2
1
3
4
467-307
1
2
3


Back to Top