TM-5-2330-325-13-P

SEMITRAILER, MEDIUM HEAVY EQUIPMENT TRANSPORTER (MHET), 40 TON, M870A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-2330-325-13-P - Page 217 of 648

FIELD MAINTENANCE
FRONT AND REAR 24-VOLT RECEPTACLE REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's
(WP 0144, Table 1, Item 16)
Materials/Parts
Nut, Self-Locking
Materials/Parts (cont.)
Qty: (8) (WP 0101, Figure 4, Item 8)
Strap, Tiedown (WP 0143, Table 1, Item 27)
Equipment Condition
Semitrailer parked and lowered to ground
(WP 0005)
Gooseneck gravel guard removed (WP 0074)
WARNING
Remove all power to semitrailer prior to making any repairs on the electrical
system. Failure to comply may result in death or injury to personnel. Seek medical
attention in the event of an injury.
Secure kingpin stowage box lid open prior to removing 24-volt receptacles. Failure
to comply may result in death or injury to personnel. Seek medical attention in the
event of an injury.
Lower semitrailer to ground to allow gooseneck to fully lower. Failure to comply
may result in death or injury to personnel. Seek medical attention in the event of
an injury.
TM 5-2330-325-13&P
0047
0047-1


Back to Top