TM 5-2330-378-14&P
5-19. GOOSENECKHINGEPIN REPLACEMENT(M870)(continued).
WARNING
Beforeremovinghingepin,the partbeingfreedmustbe supported.If hingepinis
beingremovedfromlowerlinkassembly,supportendof lowerlink assemblywith
dollyjack. If hingepinis beingremovedfromdeckassemblyarm,deckassembly
mustbe supportedbyoverheadhoist. Failuretodosomayresultininjuryordeath.
12.
Screw rod of slide hammer into nut (10). Using slide hammer, remove hinge pin (5) from lower link assembly
(12) or deck assembly arm (13).
13
6
0
8
12
5
6
7
3
11
4
b.
INSTALLATION
5
1 .
Drive new hinge pin (5) into lower link assembly (12) or deck assembly arm (13).
2.
Install lubrication fitting (9) in hole (11) in hinge pin (5).
3.
Using crane, raise gooseneck (6) to upright position.
4.
Install two lockpins (para 2-8).
5.
Remove hydraulic jacks from underside rail (8).
6.
Install retaining ring (3) on hinge pin (5) behind semitrailer frame (4) and weld (refer to TC 9-237).
:Zo
@'0@0
5@
1
2
7nz'_'@
-7
r;z@
6@7
7.
Using crane, lift front end of semitrailer. Remove wood blocks (1) from under landing pads (2).
FOLLOW-ON TASKS:
Lower gooseneck (para 2-10).
5-49