INSTALLATION
1.
Slide track and blade control box (Figure 2, Item 2) behind instrument panel (Figure 2, Item 4) and install two
washers (Figure 2, Item 5) and two screws (Figure 2, Item 6).
2.
Install manifold harness connector (Figure 2, Item 3) on track and blade control box (Figure 2, Item 2).
3.
Install control box power harness connector (Figure 2, Item 1) on track and blade control box
(Figure 2, Item 2).
5
M0002HBF
1
2
3
4
6
5
6
Figure 2.
Track and Blade Control Box Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect negative battery cables (TM 5-2350-262-20).
2.
Close battery box (TM 5-2350-262-10).
END OF TASK
END OF WORK PACKAGE
TM 5-2350-377-13&P
0029
0029-2