TM-5-2350-377-14-P

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) SUPPORTING THE HYDRAULIC BLADE FOLDER-TRACK TENSIONER (HBF-TT)

  TM-5-2350-377-14-P - Page 37 of 335

TM 5-2350-377-14&P
OPERATING PROCEDURES - continued
NOTE
Suspension control levers must remain in the LOWER position throughout Step 11. If levers
are returned to the neutral position before completion of step, Step 11 must be repeated.
11. Push left (12) and right (11) suspension control levers forward to LOWER position and hold for 10 to 12 seconds.
(Observe front of vehicle begins to lower, but MAY not completely drop to the ground).
If front of vehicle does not
contact the ground, follow steps 4 through 9.
12. Return suspension control levers (12) and (11) to neutral position.
13. Pull both left (12) and right (11) suspension control levers rearward to RAISE position and level the vehicle. (Vehicle
hull will stop momentarily while track adjusting cylinders function.)
14. Place SPRUNG/UNSPRUNG control lever (1) in SPRUNG mode. Proceed with mission.
NOTE
If unable to correctly adjust track tension, notify unit maintenance.
END OF WORK PACKAGE
11
12
0005 00-8
1
0005 00


Back to Top