TRUCK SERVICE MANUAL
TRANSMISSION
INSPECTION AND REBUILD
Para 6-9/6-10
b.
Assembly (B, foldout 7)
(1)
If bearing 25 was removed, install a new
bearing, ungrooved end first, into pump hub 27.
Install
gasket 26.
(2)
Install a 3/8-24 headless guide bolt into
converter pump hub 27 or gear 32.
Install sealring 20
onto the outside diameter of converter pump assembly
21.
(3)
Install converter pump hub 27 onto the
converter pump.
Remove the guide bolt.
Install two
bearing retainers 19 and retain them with twelve
3/8-24
x 1 1/4-inch bolts (pump hub 27) and six new lockstrips.
Tighten the bolts to 33 to 40 pound feet (45 to 54 Nm)
torque.
Bend one lockstrip corner against each bolt
head (fig. 6-12).
6-10.
CONVERTER HOUSING WITH 2-BOLT TOP
COVER, FRONT SUPPORT, OIL PUMP.
a.
Disassembly
(1)
Place the converter housing front downward
(fig. 6-13).
Remove two sealrings, needle bearing and
race from the front support hub.