TM-5-5420-202-20-2

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 2 OF 4

OCTOBER 1985

  TM-5-5420-202-20-2 - Page 144 of 734

TM 5-5420-202 -20-2
LEFT OUTER AND INNER ENGINE-TO-TRANSMISSION OIL LINE TUBE ASSEMBLIES
REPLACEMENT (Sheet 4 of 4)
11.
12.
13.
14.
15.
16.
17.
18.
Remove rags or drip pan placed under transmission connector (J and R) and oil cooler
connectors (H and Q).
Replenish oil lost during oil line tube assembly’s removal (LO 5-5420-202-12).
Connect powerplant for powerplant ground hop (page 5-25).
Start and run engine.
Check for oil leaks at oil cooler and transmission oil line tube assembly
connections.
Shut down engine.
Disconnect powerplant from ground hop (page 5-40).
Install engine shroud (page 9-31).
Install rear engine shroud support (page 9-40).
Install powerplant (page 5-14).
End of Task
6-71


Back to Top