TM-5-5420-202-20-2

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 2 OF 4

OCTOBER 1985

  TM-5-5420-202-20-2 - Page 706 of 734

TM 5-5420-202-20-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 4 of 5)
Outer Shroud Replacement (Sheet 1 of 1)
TOOLS:
1/2 in. combination box and open end wrench
1/2 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2)
REMOVAL:
NOTE
Procedures for replacement of the left or right
transmission shrouds are similar. Procedures
for the left side are shown.
INSTALLATION:
1.
Using 1/2 inch socket, remove
screw and lockwasher (A).
2.
Using 1/2 inch socket and 1/2
inch wrench, remove three screws,
lockwashers, and nuts (B) securing
outer shroud (C).
3.
Remove outer shroud (C).
1.
2.
3.
4.
5.
Position outer shroud (C) to turbocharger.
Install three screws, lockwashers, and nuts (-B) to secure outer shroud (C) to turbocharger.
Install screw and washer (A) to secure outer shroud (C) to turbocharger.
Using 1/2 inch socket and 1/2 inch wrench, tighten screws (A and B).
Install powerplant (page 5-14).
End of Task
9-45


Back to Top