TM 5-5420-202-20-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 4 of 6)
Inner Shroud Replacement (Sheet 4 of 4).
11. Install transmission oil cooler lines (page 6-66 or 6-70).
12. Ground hop engine (page 5-25) and check for oil leaks.
13. Install rear engine shroud support (page 9-39).
14. Disconnect engine from powerplant test run hookup (page 5-40).
15. Install powerplant (page 5-14).
End of Task
9-44