TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 401 of 1060

TM 5-5420-202-20-3
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 5 of 6)
5.
6.
7.
8.
At back side of gage indicator panel,
use spanner wrench to connect harness
connector (J) to gage indicator panel
connector.
Using 7/16 inch socket and 7/16 inch
wrench, install screw (K), three new lock-
washers (L), and nut (M) securing ground
lead (N) to gage indicator panel.
Connect electrical leads (P) and (Q) (CKT 27).
Using 7/16 inch socket, install screw (R) and new lockwasher (S) securing ground leads
(N) and (T) and clamp (U) to center post.
Go on to Sheet 6
5-63
Change 7
10-296.61


Back to Top