TM 5-5420-202-20-3
GASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 6 of 6)
9.
Using 7/16 inch socket, install screw (V)
and new lockwasher (W) securing clamp (X)
and harnesses (A), (Y), and (Z) to overhead
crossbeam (AA).
10.
11.
12.
13.
Using 7/16 inch socket, install screw
(AB) and new lockwasher (AC) securing
clamp (AD) and (AE) and harnesses (A),
(Y), and (Z) to overhead crossbeam (AA).
Using 7/16 inch socket, install screw (AF)
and new lockwasher (AG) securing clamps
(AH) and (AJ) and harnesses (A), (Y), and
(AK) to overhead crossbeam (AA).
At operator’s station, connect harness
(A) to POWERPLANT WARNING LAMP
(AL).
Connect three ground straps at batteries
(page 10-268).
End of Task
5-64
10-296.62
Change 7