TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 407 of 1060

TM 5-5420-202-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 5 of 6)
6.
7.
8.
9.
Position cable assembly
(G) in vehicle.
Thread cable assembly
(G) onto stowage
receptacle (H).
Press cable (G) into
spring clamp (J)
on overhead crossbeam.
Place cable (G) in
clamp (K) with har-
nesses (L) and (M).
10.
11.
12.
Using
socket
7/16 inch
, install screw
(N) and new lock-
washer (P) to secure
clamp (K), cable (G),
and harnesses (L)
and (M) to overhead
crossbeam.
Place cables (A)
and (G) inside clamp (Q).
Using 7/16 inch socket,
install screw (R) and new
lockwasher (S) to secure
clamp (Q) and ground leads
from gage indicator and
master control panels to
center post.
Go on to Sheet 6
5-69
Change 7
10-296.67


Back to Top