TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 404 of 1060

TM 5-5420-202-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 2 of 6)
3.
At center post, use 7/16
inch socket to remove
screw (E) and lockwashers
(F) that secure clamp (G),
5.
6.
7.
cable assemblies (B) and
(C), and ground leads
from gage indicator and
master control panels.
socket to remove screw (H) and lockwasher
(J) cecuring clamp (K), cable assembly
(B), and harnesses (L) and (M).
Remove cable assembly (B) from clamp
(J).
Remove cable assembly (B) from spring
clamp (N).
At operator’s station, unthread cable
assembly (B) from stowage receptacle
(P).
Remove cable (B) from vehicle.
8.
Go on to Sheet 3
5-66
10-296.64
Change 7
4.
On overhead crossbeam, use 7/16 inch


Back to Top