BULKHEAD P TO RING REPLACEMENT (Sheet 1 of 1)
TM 5-5420-202-20-4
TOOLS: 7/16 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
Putty knife
SUPPLIES:
Gasket
Adhesive (Item 4, Appendix D)
Lockwashers (12 required)
Self-locking nut (8 required)
PRELIMINARY PROCEDURE: Remove universal joint (TM 5-5420-228-24)
REMOVAL
1.
Using socket, remove eight self-locking nuts (A) from ring (B).
2.
Using socket, remove 12 screws and lockwashers (C), securing ring (D) and gasket (E) to
cover (F).
3.
Remove rings (B) and (D), and gasket (E). Throw gasket away.
4.
Using putty knife, scrape off all gasket and adhesive residue.
INSTALLATION:
1.
Apply adhesive to surface (G) and surface (H) of new gasket (E).
2.
Position rings (B) and (D), and gasket (E) on cover (F) with holes alined.
3.
Using socket, install 12 screws and lockwashers (C) securing ring (D) and gasket (E) to
cover (F).
4.
Using socket, install eight nuts (A) securing ring (B) and gasket (E) to p to housing.
5.
Install universal joint (TM 5-5420-228-24).
End of Task
TA248546
17-15