TM5-5420-228-24
Section Il. PUMP-CLUTCH AND VALVE BANK
PUMP-CLUTCH DRIVE REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
4-23
Cleaning and Inspection
4-24
Installation
4-25
TOOLS:
3/4 in. socket with 1/2 in. drive
5“ in. extension with 1/2 in. drive
Ratchet with 1/2 in. drive
Snap ring pliers (inside)
Puller kit
Arbor press
3/8 in. socket head screw key
SUPPLIES:
Wooden block, 1 x 4 in., 3 in. long (make from Item 32, Appendix D)
Dry cleaning solvent (Item 15, Appendix D)
Lockwashers (4 required)
Rags (Item 12, Appendix D)
Gloves (Item 27, Appendix D)
REFERENCES:
TM 5-5420-202-10
PRELIMINARY PROCEDURES:
Remove universal joint (page 3-62)
Remove pump-clutch cover plate (page 3-65)
REMOVAL.:
1.
Place wooden block under clutch (A).
2.
Using screw key, remove setscrew (B).
3.
Using socket, remove four screws (C) and
lockwashers (D). Throw lockwashers (D)
away.
Go on to Sheet 2
TA251674
4-23