TM 9–1200–215–34&P
6–11
6–13.
TOP COVER ASSEMBLY MAINTENANCE INSTRUCTIONS CONTINUED
b.
INSTALLATION CONTINUED
4.
Connect connector P12 (9) to PCU Main CCA
receptacle
J12 (14). Torque two captive
screws (8) to 3.2
"
.2 in.–lb (.34
"
.02 N
S
m).
5.
Connect connector P11 (7) to PCU Main CCA
receptacle
J11 (15). Torque two captive
screws (6) to 3.2
"
.2 in.–lb (.34
"
.02 N
S
m).
6.
Connect connector P10 (5) to PCU Main CCA
receptacle
J10 (16). Torque two captive
screws (4) to 3.2
"
.2 in.–lb (.34
"
.02 N
S
m).
7.
Place top cover assembly (1) on PCU housing
and align holes.
8.
Insert 22 screws (2) and 22 flat washers (3).
Torque 22 screws to 20+ 4 in.–lbs
(2.3+ .5 N
S
m).
9.
Purge PCU with nitrogen following procedure
outlined in paragraph 1–23.
Change 1
P10
J10
J12
P12
J11
J9
P11
4
5
16
15
7
14
8
9
6
3
1
2
P9
NOTE:
LAYOUT OF CONNECTORS
AND RECEPTACLES
ON PCU MAIN CCA