TM-9-1200-215-34-P

AUTOMATIC FIRE CONTROL SYSTEM (AFCS)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

FEBRUARY 1999

  TM-9-1200-215-34-P - Page 162 of 266

TM 9–1200–215–34&P
6–8
6–10.
TROUBLESHOOTING PROCEDURES
All internal troubleshooting for the PCU will be performed by automated testing. Refer to TPS 12958912 for
specific PCU troubleshooting procedures.
6–11.
POST–MAINTENANCE TEST
Follow the procedures outlined in TPS 12958912 to verify the operation of the PCU.
Section
V – MAINTENANCE PROCEDURES
Page
Page
General
6–8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Top Cover Assembly Maintenance
Instructions
6–9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CCA Maintenance Instructions
6–12
. . . . . . . . . . . . . . .
Handle Maintenance Instructions
6–14
. . . . . . . . . . . . .
6–12.
GENERAL
a.
This section contains the step–by–step maintenance procedures for DS level maintenance of the PCU.
These procedures are provided to access components for general maintenance. These maintenance tasks are
authorized by the Source, Maintenance and Recoverability (SMR) codes indicated in the RPSTL in Appendix C.
There are no GS level maintenance tasks for the PCU.
b.
Figure 6–6 below is an exterior
view of the PCU.
Figure 6–6. Power Conditioning Unit


Back to Top