TM 9–1200–215–34&P
6–1
CHAPTER 6.
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS FOR
POWER CONDITIONING UNIT (PCU)
Section
I – REP
AIR P
ARTS, T
OOLS, SPECIAL T
OOLS, TEST
,
MEASUREMENT AND DIAGNOSTIC EQUIPMENT (TMDE), AND
SUPPORT EQUIPMENT
.
Page
Page
Common Tools and Equipment
6–1
. . . . . . . . . . . . . .
Special Tools, TMDE, and Support Equipment
6–1
.
Repair Parts
6–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6–1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE),
CTA 50–970, or CTA 8–100, as applicable to your unit.
6–2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Refer to Appendix C, Repair Parts and Special Tools List (RPSTL) for applicable special tools, TMDE, and
support equipment.
6–3.
REPAIR PARTS
Refer to Appendix F of this manual for a list of mandatory replacement parts.
Repair parts are listed and
illustrated in Appendix C of this manual.
Section
II – SER
VICE UPON RECEIPT
.
Page
Page
Site and Shelter Requirements
6–1
. . . . . . . . . . . . . .
Service Upon Receipt of Materiel
6–1
. . . . . . . . . . . .
6–4.
SITE AND SHELTER REQUIREMENTS
Power Conditioning Unit DS maintenance will be performed using the facilities contained within the Electronic
Shop, Transportable, AN/TSM–191(V)3.
6–5.
SERVICE UPON RECEIPT OF MATERIEL
a.
Unpacking.
(1)
Place packed Power Conditioning Unit (PCU) on a work bench.
(2)
Check the condition of the packaged PCU.
Check the markings.
Note discrepancies.
(3)
Do not use sharp blades or sharp cutting tools when unpacking the PCU.
Remove packing material
carefully.
b.
Check unpacked equipment.
(1)
Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged,
report the damage on SF 364, Report of Discrepancy.