TM 9-2320-209-34-2-3
FRAME 5
1.
Working at front of right air reservoir (1), put on retaining strap (2).
2.
Put in two capscrews (3) and locknuts (4).
CAUTION
Do not tighten coupling nut (5) too much.
coupling nut onto fitting, then tighten nut
3.
Put on coupling nut (5).
Follow-on
1.
Do air system
NOTE
Maintenance Action
Finger tighten
1/8 turn.
Required:
leak test.
Refer to TM 9-2320-209-20.
2.
Replace power divider propeller shaft. Refer to
TM 9-2320-209-20.
3.
Replace transfer-to-forward-rear axle propeller
shaft.
Refer to Propeller Shaft and Universal
Joint Removal and Replacement, TM 9-2320-209-20.
4.
Replace earth boring machine propeller shaft. Refer
to TM 9-2320-209-20.
END OF TASK
18-273