FIELD MAINTENANCE
ACCELERATOR LINKAGE REPLACEMENT (M939/A1)
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP
0826, Table 1, Item 56)
Materials/Parts
Locknut (Volume 5, WP
0827, Table 1, Item 274)
Qty:
1
Locknut (Volume 5, WP
0827, Table 1, Item 314)
Qty:
1
Materials/Parts (cont.)
Screw (Volume 5, WP
0827, Table 1, Item 434)
Qty:
1
Spring Pin
(Volume 5, WP
0827, Table 1, Item 302)
Qty:
1
Personnel Required
(2)
Equipment Condition
Parking brake set. (TM 9-2320-272-10)
Hood raised and secured. (TM 9-2320-272-10)
Left splash shield removed. (TM 9-2320-272-10)
TM 9-2320-272-23-2
0268
0268-1