TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 1402 of 1469

INSTALLATION
Install cross tube (Figure 2, Item 3) on two rear axle bogie supports (Figure 2, Item 1) with eight screws
(Figure
2, Item
2) and locknuts (Figure 2, Item 4). Tighten locknuts 1,200 to 1,300 lb-ft (1,627 to 1,763 N·m).
M10271DAA
4
3
1
2
Figure 2.
Cross Tube Installation
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install spring seat. (WP
0540)
2.
Install rear springs. (WP
0539)
3.
Install torque rods (lower). (WP
0544)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0542
0542-3/4 blank


Back to Top