TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 291 of 1469

INSTALLATION - Continued
NOTE
Assistant will help with Step (2).
2.
Route shift cable (Figure 5, Item 4) from shift tower (Figure 5, Item 2), through shift tower (Figure 5, Item 1).
3.
Install jamnut (Figure 5, Item 3) and trunnion (Figure 5, Item 2) on shift cable (Figure 5, Item 4) at shift tower
(Figure 5, Item 1). Thread trunnion on shift cable until shift cable is flush with trunnion. Tighten jamnut.
M9575DAA
2
3
1
4
Figure 5.
Shift Tower Installation.
TM 9-2320-272-23-3
0371
0371-6


Back to Top