INSTALLATION - Continued
7.
Install pin (Figure 22, Item 2) through top hole in left front post assembly (Figure 22, Item 1) with two cotter
pins (Figure 22, Item 3).
8.
Install left front post assembly (Figure 22, Item 1) on left post support (Figure 22, Item 5) with pin
(Figure
22,
Item
2) resting on left post support and install with three screws (Figure
22,
Item
4) and locknuts
(Figure 22, Item 6).
M6312DAA
2
5
6
3
1
3
4
Figure 22.
Lightweight Weapon Station Installation.
TM 9-2320-272-23-5
0775
0775-32