4-7. PREPARING
TM 9-2320-272-24-2
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODELS
All
TOOLS
General mechanic’s tool kit (Appendix E, Item 1)
MATERIALS/PARTS
Six lockwashers (Appendix D, Item 416)
Three locknuts (Appendix D, Item 313)
Antiseize tape (Appendix C, Item 72)
Gap and plug set (Appendix C, Item 14)
REFERENCES (TM)
TM 9-2320-272-24P
EQUIPMENT CONDITIONS
Engine and transmission
(para. 4-4 or para. 4-5).
removed from vehicle
1.
Remove shutoff valve (1) and adapter (2) from engine oil cooler (3).
2.
Remove shutoff valve (7) and adapter (6) from water manifold (4).
3.
Remove high-temperature switch (5) from water manifold (4).
4.
Remove water temperature sending unit (8) from water manifold (4).
CAUTION
Plug all open ports to prevent dirt or contamination from entering
engine.
NOTE
Perform this task when preparing removed engine for installation
in vehicle.
4-91