TM-9-2320-272-24-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 3 OF 4

JUNE 1998

  TM-9-2320-272-24-3 - Page 676 of 799

4-201. CRANE
TM 9-2320-272-24-3
1.
2.
3.
4.
5.
6.
Install hydraulic elevating cylinder crossover tube (16) on control valve adapter (12).
7.
Install control valve elbow (18) on hydraulic control valve adapter (11).
8.
Install hydraulic oil reservoir crossover tube (17) on control valve elbow (18).
9.
Install control valve cover (20) on gondola (10) with five screws (19).
NOTE
If new crane control valve is being installed, fittings from old
crane control valve may be used. Two side control plates and
base may be used. Fittings must be cleaned and inspected for
cracks and stripped threads.
During installation, make sure all hydraulic lines are connected
at their marked locations.
Install control valve (1) on gondola (10) with four screws (9) and new locknuts (8). Tighten
screws (9) 44-61 lb-ft (60-83 N•m).
Install two hydraulic hoist motor flex lines (7) on control valve adapter fittings (2).
Install two hydraulic crowd cylinder flex lines (6) on control valve adapter fittings (3).
Install two hydraulic swinger motor flex lines (5) on control valve adapter fittings (4).
Install control valve tube (14) on hydraulic swivel valve flex line (15) and hydraulic control valve
adapter (13).
4-940


Back to Top