4-203. TURNTABLE
TM 9-2320-272-24-3
FOLLOW-ON TASKS:
Install gondola (para. 4-202).
Install crane swinger gearcase (para. 4-200).
Install hydraulic swivel valve (para. 4-198).
Install boom elevating cylinders (para. 4-193).
Lubricate gear bearing (LO 9-2320-272-12).
Install hydraulic oil reservoir (para. 4-188).
4-949