TM-9-2320-273-34

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 1980

  TM-9-2320-273-34 - Page 546 of 801

TM 9-2320-273-34
b.
Remove eight bolts (9), washers (8), and locknuts (7) from torque bushings. Lower jack
enough to clear subframe assembly (10) and remove torque tube (1).
c.
Inspect tube for signs of damage or cracks. Check four welds holding torque bushings to tube.
If welds are damaged, refer to TM 9-237.
d.
Install torque tube (1) and secure to subframe assembly (10) with eight bolts (9), washers (8) and
locknuts (7). Raise jack as necessary to mate subframe and torque bushings. Torque bolts to 200 Ib-ft
(271 N·m).
e.
Install torque cap (5) and secure to axle and drawbar assembly (6) with four bolts (2), washers
(3) and locknuts (4). Torque bolts to 200 Ib-ft (271 N·m).
13-2


Back to Top