TM-9-2320-273-34

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 1980

  TM-9-2320-273-34 - Page 641 of 801

TM9-2320-273-34
d.
Install the alinement clamps in their original positions. Torque the nuts 45-55 Ib-ft (61-74
N.m).
e.
Remove the spring assembly from the vise.
18-5. Installation.
Position spring on a hydraulic jack and raise into place. Position the front spring eye with the
bolt hole in the front bracket and install the bolt, washer, and nut (fig. 18-1). Do not tighten at this
time.
b.
Aline the rear spring eye with the shackle bolt hole and install the bolt and nut. Torque bolt
to 300-400 Ib-ft (407-452 N.m). Install cotter pin.
c.
Torque bolt on the front spring eye to 300-400 Ib-ft (407-452 N.m). Install cotter pin.
d.
Depending on vehicle model being serviced, refer to para 2-14c or 2-15c and install front
axle assembly.
18-4
a.


Back to Top