TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 891 of 1320

Change 2
TM 9-2320-304-14&P
5-139
Direct Support and General Support Maintenance (Cont)
c. Left Front Compression Frame Mounting Bracket Removal.
Remove eight locknuts (1), four 4.00 in. (102 mm) screws (2), 3.75 in. (95 mm) screws (3),
eight washers (4), spacers (5), and left front compression frame mounting bracket (6)
from frame (7). Discard locknuts.
d. Left Front Compression Frame Mounting Bracket Installation.
(1)
Install left front compression frame mounting bracket (6) on frame (7) with four 4.00 in.
(102 mm) screws (2), 3.75 in. (95 mm) screws (3), eight washers (4), spacers (5),
and new locknuts (1).
(2)
Tighten locknuts to 210 lb-ft (285 N
S
m).


Back to Top