0030
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13. Install NO. 1 DRIVER SIDE DISCHARGE cap (1), DRIVER SIDE AUX. INLET cap (2), NO. 2 PASSENGER
SIDE DISCHARGE cap (3), PASSENGER SIDE AUX. INLET cap (4), and main inlet cap (5).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14. Connect power cord between HEWATT shoreline receptacle (23) and power source.
15. If required, follow Standard Operating Procedures (SOP) and fill out pump run log, indicating total pumping
time and out-of-station time.
16. Report all pump, truck equipment malfunctions, and irregularities to your Supervisor.
END OF WORK PACKAGE
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.