TM 9-2320-328-13&P-2
0197-4
DRAFT
0197
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Position pressure governor control (4) on pressure governor control base (8) and tighten knob (7).
6.
Connect pressure governor control connector (6) on pressure governor control (4) and tighten screw (5).
7.
Install cover (3) on pressure governor control (4) with two lockwashers (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
HWT2796