TM 9-2320-328-13&P-2
0232-2
DRAFT
0232
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Install beacon light (5) on pump house panel K (6) with two screws (4) and locknuts (3).
2.
Connect main wire harness connector (1) on beacon light connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump house panel K access door (WP 0008)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
HWT2799