TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 937 of 1390

TM 9-2320-328-13&P-2
0264-3
DRAFT
0264
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9.
Remove four nuts (19), lockwashers (20), eight washers (21), screws (22), and bracket (18) from pump house
frame (23).
Discard lockwashers.
END OF TASK
INSTALLATION
NOTE
Perform Steps (1) and (2) if bracket was removed.
1.
Install bracket (18) on pump house frame (23) with four screws (22), eight washers (21), four
lockwashers (20), and nuts (19).
2.
Install shutoff control valve manifold (WP 0270).
NOTE
Perform Steps (3) and (4) if pump house power distribution wire harness and block and
pass-through terminal blocks need to be installed on power distribution box.
3.
Install two pass-through terminal blocks (WP 0241).
4.
Install pump house power distribution wire harness and block (WP 0299).
5.
Install distribution box (17) on bracket (18) with four screws (16), eight washers (15), four lockwashers (14),
and nuts (13).
HWT2810


Back to Top