TM 9-2320-328-13&P-2
0262-2
DRAFT
0262
INSTALLATION
1.
Install circuit breaker (3) on subpanel (4).
2.
Close power distribution box cover (2) and tighten two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panel K (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT2802