TM 9-2320-328-13&P-2
0260-1
DRAFT
0260
FIELD LEVEL MAINTENANCE
POWER CABLE ASSEMBLY REPLACEMENT (SINCGARS)
INITIAL SETUP:
REMOVAL
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Note routing of power cable assembly to ensure correct installation prior to removal to
ensure proper installation.
•
Remove cable ties and cushion clips as required.
1.
Remove nut (1), lockwasher (2), and T1 connector (3) from power terminal (4).
Discard lockwasher.
2.
Remove nut (5), lockwasher (6), and T2 connector (7) from ground terminal (8).
Discard lockwasher.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2377
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Tags, Identification (WP 0400, Item 23)
Ties, Cable, Plastic (WP 0400, Item 26)
Lockwasher (1)
Lockwasher (1)
References
WP 0008
WP 0391, Fig. 26
Equipment Conditions
Cab instrument panel A removed (WP 0205)