TM 9-2320-328-13&P-2
0263-2
DRAFT
0263
INSTALLATION
ALL PUMP HOUSE DISTRIBUTION BOX RELAYS ARE INSTALLED THE SAME WAY.
1.
Install relay (3) on subpanel (4).
2.
Close power distribution box cover (2) and tighten two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panel K (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT02807