TM 9-2320-328-13&P-2
0262-1
DRAFT
0262
FIELD LEVEL MAINTENANCE
PUMP HOUSE POWER DISTRIBUTION BLOCK CIRCUIT BREAKER REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
All pump house distribution box circuit breakers are replaced the same way.
1.
Loosen two screws (1) and open power distribution box cover (2).
2.
Remove circuit breaker (3) from subpanel (4).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2802
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
References
WP 0391, Fig. 42
Equipment Conditions
Pump house panel K removed (WP 0339)