TM-9-2320-366-20-3

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 3 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-366-20-3 - Page 359 of 1396

Change 2
2-2285
TM 9-2320-366-20-3
CONTINUITY TEST
(1) Remove circuit breaker CB1 from Power
Distribution Panel (PD2).
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter to
one terminal of circuit breaker CB1.
(4) Connect negative (-) probe of multimeter to
other terminal of circuit breaker CB1 and
note reading on multimeter.
(5) If continuity is not present, replace circuit
breaker CB1 (para 20-80).
(6) Install circuit breaker CB1 in Power
Distribution Panel (PD2).


Back to Top