TM 9-2320-366-34-3
Change 2
16-500.3
(7)
Install two solenoids washers (14), and nuts (15) on
linear directional control valve (1).
e. Adjustment.
(1) Install SECONDARY CIRCUIT SELECTOR VALVE
(para 16-80).
(2) Remove hose (1) from upper main valve fitting (2).
(3) Install plug (3) in hose (1).
(4) Install swivel tee (4) on upper main valve fitting (2).
(5) Install reducer (5) and cap (6) on swivel tee (4).
(6) Connect test hose (7) to reducer (5).
(7) Connect 10,000 psi transducer (8) to test hose (7).
(8) Connect 10,000 psi transducer (8) to STE/ICE-R.