TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 406 of 1616

TM 9-2320-440-13&P
0040-4
0040
MRP LOCKS DO NOT ENGAGE (CONTINUED)
THAAD0620
Step 6.
Connect pressure gage and hose to test port TP3. Remove safety wire from solenoid
HV7. Start engine (
Position LHS cab control mode select switch to
MRP position (WP 0012). Soldier A checks for 3,000 psi (20,684 kPa) at test port TP3,
while HV7 bypass valve is pulled out and turned, and Soldier B attempts to engage
MRP rack locks (WP 0012). Shut off engine (
Disconnect pressure
gage and hose.
a.
If 3,000 psi (20,684 kPa) is measured, replace MRP distribution
manifold (WP 0126).
b.
If 3,000 psi (20,684 kPa) is not measured, install safety wire on solenoid
HV7 and replace MRP control valves (WP 0138).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top