TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 598 of 1348

INSTALLATION - Continued
1
2
3
4
5
6
7
8
ADJUSTMENT
PLATE
9
10
Figure 10.
Axles No. 2 and 3 Installation.
7.
Position two axle U-bolts (Figure 10, Item 7), eight washers (Figure 10, Item 4), and four nuts (Figure 10, Item
3).
NOTE
Alignment of Axle No. 1 must be performed prior to aligning Axle No. 2 and Axle No. 3.
8.
Perform alignment procedures for Axle No. 1 (WP
0060), Axle No. 2 (WP
0062), and Axle No. 3 (WP
0063).
9.
Tighten nuts (Figure 11, Item 3) to 130 lb-ft (176 N·m) on side of axle that has adjusting plate (Figure 11, Item
2) unwelded.
TM 9-2330-342-23&P
0064
0064-10


Back to Top