INSTALLATION - Continued
1
2
3
4
7
8
6
5
Figure 13.
Axles No. 2 and 3 Installation.
15.
Install air line (Figure 13, Item 7) on fitting (Figure 13, Item 8).
16.
Install air line (Figure 13, Item 3) on fitting (Figure 13, Item 4).
17.
Install air line (Figure 13, Item 6) on fitting (Figure 13, Item 5).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install axle tiedown brackets (Axle No. 3 only). (WP
0065)
2.
Install wheels. (WP
0094)
3.
Adjust brakes. (WP
0066)
4.
Spot paint exposed surfaces (TM 43-0139). (WP
0190)
5.
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE