TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 603 of 1348

FIELD MAINTENANCE
AXLE TIEDOWN BRACKET REMOVAL/INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Protractor, Magnetic (WP
0194, Table 1, Item 2)
Tool Kit, General Mechanic’s: Automotive
(WP
0194, Table 1, Item 47)
Wrench, Torque, Click, Ratcheting, 1/2" Drive, 250
ft-lb (WP
0194, Table 1, Item 42)
Materials/Parts
Locknut Qty:
2 (WP
0195, Table 1, Item 82)
References
Fig. 17 (WP
0152)
Equipment Condition
Wheels chocked (TM 9-2330-342-10). (WP
0190)
REMOVAL
NOTE
Right and left axle tiedown brackets are removed and installed the same way.
Remove two locknuts (Figure 1, Item 4), axle tiedown bracket (Figure 1, Item 3), and U-bolt (Figure 1, Item 2)
from axle (Figure 1, Item 1). Discard locknuts.
1
2
3
4
Figure 1.
Axle Tiedown Bracket Removal.
END OF TASK
INSTALLATION
1.
Position U-bolt (Figure 2, Item 3), axle tiedown bracket (Figure 2, Item 4), and two locknuts (Figure 2, Item 5)
on axle (Figure 2, Item 2), 0.500 in. (12.7 mm) from suspension hanger U-bolt (Figure 2, Item 1).
TM 9-2330-342-23&P
0065
0065-1


Back to Top