INSTALLATION - Continued
FRONT
1
2
4
5
6
7
3
Figure 9.
Flatrack Air Chamber Installation.
6.
Install load lock air chamber (Figure 9, Item 1) on frame (Figure 9, Item 4) with two washers (Figure 9, Item 2)
and locknuts (Figure 9, Item 3).
NOTE
If installing right side load lock air chamber, perform Step (7). If installing left side load lock
air chamber, perform Step (8).
7.
Install air line 2078 (Figure 10, Item 1) on fitting (Figure 10, Item 2).
FRONT
1
2
Figure 10.
Flatrack Air Chamber Installation.
8.
Install air lines 2078 (Figure 11, Item 6) and 2081 (Figure 11, Item 4) on fitting (Figure 11, Item 5).
TM 9-2330-342-23&P
0104
0104-7