TM-9-2350-238-20-1

HULL AND RELATED COMPONENTS RECOVERY VEHICLE, FULL TRACKED: LIGHT, ARMORED, M578

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL

MAY 1994

  TM-9-2350-238-20-1 - Page 1140 of 1364

TM 9-2350-238-20-1
2-196. MAINTENANCE OF CRANE OPERATOR’S ENCLOSURE KIT (CONT).
INSTALLATION (CONT)
9
10
11
12
13
14
Position crane operator’s base assembly
(7) on cupola (16) with notched section
towards rear.
NOTE
Use hull brackets as a template for
locating and drilling holes for four
crane operator’s base assembly
mounting screws.
Using drill cutting fluid, drill four 7/32-in.
(5.56-mm) holes through cupola (16). Tap
holes to 0.250-28 UNF-2B.
Insert wiper motor and defroster lead
disconnect branched wiring harness (17)
through notch in crane operator’s base
assembly (7), and lower crane operator’s
base assembly onto cupola (16).
Install wiper motor and defroster lead
disconnect branched wiring harness (17),
lockwasher (18), and hexagon head
capscrew (19) on hull bracket (20).
Install three lockwashers (21), and three
hexagon head capscrews (22), in three
hull brackets (23). Torque four hexagon
head capscrews to 90.00 ± 5.00 in.-lb
(10.17 ± 0.56 N-m).
Apply sealant (item 35, appx C) to seal
area between wiper motor and defroster
lead disconnect branched wiring harness
(17) and notch in crane operator’s base
assembly (7).
2-1114


Back to Top