TM 9-2350-236-20-1
9
10
11
12
13
Install 21 new self-locking bolts (11).
Remove nut (7), final drive lifting sling,
and hoist.
Remove two headless shoulder pins.
Install three new self-locking bolts (11).
Tighten 24 self-locking bolts (11) to 305 ft-
Ib (423 N-m) in cross pattern sequence.
14
Position headlamp guard (12), and install
four screws (13), four washers (14), and
four nuts (15).
15
Install drive sprocket hub assembly (16),
refer to page 2-869.
16
Position fender extension (17) and install
seven washers (18) and seven screws
(19) .
2-765