TM-9-2350-238-20-2

CRANE (CAB) COMPONENTS RECOVERY VEHICLE, FULL TRACKED: LIGHT,ARMORED, M578

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL

MAY 1993
CHANGE 1

  TM-9-2350-238-20-2 - Page 174 of 495

TM 9-2350-238-20- 2
2-46. MAINTENANCE OF BOOM ELEVATING, BOOM AND TOW WINCH CONTROL S
AND LINKAGE (CONT) .
INSTALLATION (CONT )
12
Install winch control panel bracket (22 )
on camlock controls support (7) an d
secure with two flat washers (23), tw o
new Iockwashers (24), and two hexago n
capscrews (25) .
13
Install three shift handle boots (26) ,
three new tiedown straps (27), and thre e
hexagon plain nuts (28) on three boo m
and tow winch manual control lever s
(29) .
14
Apply sealing compound (item 17, app x
C) to threads in three shift lever handl e
knobs (30) and install on three boom an d
tow winch manual control levers (29) .
NOT E
Check measurement of lower contro l
linkage controls after reassembly o f
clevises and nuts to rods prior to in-
stallation to manual control levers .
15
Install three boom and tow winch manua l
control levers (29) to mounting plates
(31) of camlock controls support (7) an d
secure with three headed straight pins
(32) and three new cotter pins (33) .
16
Install three hexagon plain nuts (34) o n
one end of two hydraulic valve shift rods
(35 and 36), and hydraulic valve shif t
stud (37). Install two hydraulic valv e
shift rods and hydraulic valve shift stu d
into three rod end clevises (38) an d
tighten three hexagon plain nuts (34) .
17
Install three hexagon plain nuts (39) o n
other end of two hydraulic valve shif t
rods (35 and 36), and hydraulic valv e
shift stud (37). Install two hydraulic
valve shift rods and hydraulic valve shif t
stud into three rod end clevises (40) an d
tighten three hexagon plain nuts (39) .
2-13 4


Back to Top